CECheck The reference for CE marking

CE marking costs and timelines

Last reviewed: August 2026 · Sources listed at the end of this page.

There is no official price list for CE marking, because CE marking is not a service anyone sells: it is the end-point of a conformity assessment process the manufacturer runs (what is CE marking?). The costs are the costs of that process — engineering time, standards, testing, documentation, and in some routes third-party certification. They range from little more than internal working hours for a simple self-assessed product to a long, budgeted programme for a medical device. This page explains what you pay for. We state a figure only where a public source supports it, and each is indicative, not a quote: real costs vary by product, test scope, laboratory, Notified Body, and country.

At a glance. CE marking has no fee of its own; you pay for the work behind it. Status at 31 October 2026: there is no official price list, and we found no reliable public benchmark for laboratory or Notified Body prices outside published fee lists. A Notified Body is needed only where the act and module require one. There is no single key date; plan around changes to the act that applies to your product.

What costs nothing: the mark itself

Start with the part that is free, because it is the part most often mis-sold:

Beware "CE certificate" mills. Offers of a "CE certificate" for a flat fee, issued in days by an unaccredited "certification" company, have no legal value. Such documents do not discharge any obligation, are recognised by no authority, and frequently accompany products that fail market surveillance checks. Verify any claimed Notified Body against the Commission's NANDO database, and check that the body is actually designated for the legislation and procedure in question.

Cost anatomy: the self-assessment route (Module A)

Most CE-marked products — the majority of machinery, electrical equipment under the Low Voltage Directive and EMC Directive, and many other categories — follow Module A, internal production control (conformity assessment modules). No Notified Body is legally required. The costs are:

Internal engineering and documentation time

Identifying applicable legislation (does my product need CE marking?), performing and documenting the risk assessment, applying standards, and assembling the technical documentation is typically the largest cost in disguise. Teams doing it repeatedly get much faster. This is also where under-investment shows up later as test failures and enforcement findings (common mistakes).

Purchasing harmonised standards

Harmonised standards are sold by national standards bodies, and prices differ between them. As one indicative example, list prices for ISO 12100:2010 seen in October 2026 were about €200 at Austrian Standards and about €300 including tax at EVS in Estonia. Prices vary with format, language, and tax, and a product touching several acts may need several standards. Their use is voluntary, but it is the practical route to a presumption of conformity.

Accredited laboratory testing

Self-assessment does not mean self-testing by intuition: for EMC, radio, and electrical safety, few manufacturers own the necessary chambers and instruments, so testing is bought from laboratories even where no Notified Body is required. We do not quote prices here because we found no public, comparable source for them. Get written quotes, and compare them on these points:

Cost anatomy: notified-body routes

Where the applicable act and module require third-party involvement — EU type-examination (Module B) plus a production module, quality-system modules (D, E, H), or unit verification (G) — the Notified Body charges commercial fees. Three points shape what you pay:

The NLF reference provisions require conformity assessments to be proportionate, avoiding unnecessary burdens and taking account of the size of the undertaking and the complexity of the product (Decision 768/2008/EC, Article R27(2)). Notified Bodies compete on price and lead time, so obtaining two or three quotes is normal and legitimate. What is not negotiable is the scope: the body must be designated for the specific legislation and procedure, verifiable in NANDO.

The expensive extreme: MDR and IVDR

Medical devices under the Medical Devices Regulation (EU) 2017/745 and IVDs under the IVDR 2017/746 sit at the top of the cost scale, because they combine quality management system certification, technical documentation assessment, clinical or performance evaluation, and the manufacturer's internal effort. Costs here can be checked rather than guessed: Article 50 of the MDR requires Notified Bodies to publish lists of their standard fees, so compare the lists of bodies designated for your device type. Certificates last at most five years before renewal (MDR, Article 56(2)).

On time, a summary of the Commission's Notified Bodies survey released in August 2025 reported that, from contract signature, 60% of Notified Bodies took 13 to 18 months and 29% took 19 to 24 months for MDR quality-system and product certificates. Treat this as indicative. Add recurring costs: surveillance audits, post-market surveillance and vigilance systems, and (for non-EU manufacturers) a mandatory authorised representative with sector-specific liability. The Commission proposed targeted changes to the MDR and IVDR in December 2025, so check the current position before budgeting.

Recurring and peripheral costs

Timelines and what drives them

We give no general timeline, because we found no reliable published data outside medical devices. Lab booking, Notified Body queues, and the completeness of the file decide it. MDR and IVDR work is the clear long case, as set out above. Ask laboratories and Notified Bodies for their current lead times before committing to a launch date.

The main sources of delay:

  1. Test failures and redesign loops — an EMC failure discovered at the lab means redesign, new samples, and a return to the queue.
  2. Incomplete technical documentation — Notified Bodies suspend clocks while waiting for missing risk assessments, drawings, or clinical data.
  3. Notified Body capacity — most visible in the medical sector.
  4. Standard and legal transitions — e.g. products straddling the switch to the Machinery Regulation 2023/1230 (applicable from 20 January 2027) may need their files aligned to the new act; see 2025–2026 changes.

What to budget for, by scenario

The table lists the external cost items to expect. Internal engineering time comes on top in every row.

ScenarioExternal cost itemsQuotes to obtain
Simple mechanical product, self-assessedStandards; limited testing if neededStandards bodies; a laboratory only where testing is needed
Mains-powered electrical product (LVD + EMC + RoHS), self-assessedStandards; EMC, electrical safety, and material testingTwo or more laboratories, for the same scope
Connected or radio device (adds RED)As above, plus radio testing; a Notified Body where the RED route requires oneLaboratories; a Notified Body if needed
Product requiring EU type-examination (for example certain PPE, gas appliances, ATEX equipment)Certification; production-phase surveillance where the module requires itTwo or three Notified Bodies designated in NANDO
Medical device above class I (MDR)QMS and technical documentation assessment, clinical evaluation, recurring auditsPublished fee lists under MDR Article 50, then formal quotes

Keeping costs down legitimately

Frequently asked questions

How much does CE marking cost?

There is no fixed price. The mark itself is free. What you pay for depends on the applicable act, the testing you need, and whether a Notified Body is required.

Do I have to pay anyone to affix the CE mark?

No. There is no fee, registration, or licence for affixing it. The manufacturer affixes it once the applicable conformity assessment is complete.

Why does this page not list lab prices?

We found no public, comparable source for them. Prices vary with scope and laboratory, so a figure without a source would mislead. Written quotes for the same scope are the reliable comparison.

Where can I see Notified Body fees?

For medical devices, Article 50 of the MDR requires Notified Bodies to publish lists of their standard fees. Under other acts, ask designated bodies for a quote.

Sources